Morris County Library > Reference > Public documents

Public Documents Public documents from state and local government are often filed at the library for citizen review and comment. If you are looking for something not listed here call the Reference Desk at (973) 285-6969 or e-mail us. After the review period, some documents are placed in the regular library collection. These can be found in the online catalog. Review documents from the Picatinny Arsenal are listed separately. See also state documents online as reported by the State Library.

Public Review Documents at the Reference Desk – 2005-2008
(listed by date received)

Date received: July 30, 2008 Comment deadline: September 10, 2008
Author: New Jersey Dept. of Human Services
Title: Draft Plan for the Work First New Jersey Temporary Assistance for Needy Families (WFNJ/TANF) program for Fiscal Years 2009-2011
Publication date: July 23, 2008

Date received: July 2, 2008 Comment deadline: July 15, 2008
Author: Federal Transit Administration of the Dept. of Transportation; prepared by Edwards and Kelcey
Title: New Jersey-Pennsylvania Lackawanna Cut-Off Passenger Rail Service Restoration Project Environmental Assessment
Publication date: June 2008

Date received: June 10, 2008 Comment deadline: June 12, 2008
Author: Morris Area Paratransit System (MAPS)
Title: 2009 Application for the Senior Citizens and Disabled Residents Transportation Assistance Program
Publication date: June 6, 2008

Date received: May 30, 2008 Comment deadline: June 25, 2008
Author: North Jersey Transportation Planning Authority, Inc.
Title: Transportation Improvement Plan, FY 2009-2012 Draft
Title: Northern Nwe Jersey Air Quality Conformity Determination
Publication date: May 2008

Date received: March 24, 2008 Comment deadline: April 9, 2008
Author: North Jersey Transportation Planning Authority
Title: North Jersey Regional Coordinated Human Services Transportation Plan
Publication date: March 6, 2008

Date received: March 24, 2008 Comment deadline: April 15, 2008
Author: North Jersey Transportation Improvement Plan
Title: Summary of Proposed Amendment to the FY 2008-2022 Transportation Improvement Plan
Title: Northern New Jersey Air Quality Conformity Determination
Publication date: March 2008

Date received: February 6, 2008 Application deadline: March 31, 2008
Author: Public Service Electric & Gas Company, NJ
Titile: Help is Available for Your PSE&G Bill (DVD)
Publication date: January 2008
Also available online.

Date received: January 15, 2008 Comment deadline: February 28, 2008
Author: N.J. Highlands Water Protection and Planning Council
Title: Highlands Regional Master Plan, Final Draft November 2007 (includes 1 CD)
Publication date: November 2007
Also available online

Date received: December 14, 2007 Comment deadline: none
Author: North Jersey Transportation Planning Authority
Title: Transportation Improvement Program, FY 2008-2011 (CD)
Publication date: December 3, 2007
Also available online

Date received: October 30, 2007 Comment deadline: none
Author: U.S. Dept. of Transportation, Federal Aviation Administration
Title: New York/New Jersey/Philadelphia Metropolitan Area Airspace Redesign (Record of Decision-Corrected Version)
Publication date: September 5, 2007 (Issue Date); September 28, 2007 (Corrected Date)
Also available online

Date received: July 31, 2007 Comment deadline: none
Author: U.S. Dept. of Transportation, Federal Aviation Administration
Title: New York/New Jersey/Philadelphia Metropolitan Area Airspace Redesign Project (Final Environmental Impact Statement) CD #1
Publication date: July 2007
Also online.

Date received: May 31, 2007 Comment deadline: None
Author: North Jersey Transportation Planning Authority
Title: Unified Plannning Work Program, FY 2008-FY 2009
Publication date: May 2007

Date received: May 15, 2007 Comment deadline: May 30, 2007
Author: New Jersey Transit, Service Planning and Development
Title: 2008 Senior Citizens and Disabled Residents Transportation Assistance Program, Morris Area Paratransit System
Publication Date: May 2007

Date received: April 10, 2007 Comment deadline: None
Author: U.S. Department of Transportation, Federal Aviation Administration
Title: New York/New Jersey/Philadelphia Metropolitan Airspace Redesign (Draft Environmental Impact Statement) Noise Mitigation Report
Publication Date: April 6, 2007

Date received: January 20, 2007 Comment deadline: None
Author: North Jersey Transportation Planning Authority
Title: Transportation Improvement Program, FY 2007-2010 (final copy)
Publication date: September 29, 2006

Date received: January 20, 2007 Comment deadline: March 2, 2007
Author: New Jersey Transit Corporation/Pennsylvania Department of Transportation prepared by Edwards and Kelcey, Morristown, NJ
Title: New Jersey Pennsylvania Lackawanna Cut-Off Passenger Rail Service Restoration Project (Lackawanna Cut-Off Project) Environmental Assessment
Publication date: December 2006

Public review Documents in the New Jersey Collection
Picatinny Arsenal

Picatinny Arsenal Documents for Public Review
Shelf 10 above the Morris County Budget and the Municipal Budgets.

Date received: April 21, 2008 Public comment period: April 17-May 17, 2008
Final Proposed Plan: Sites 61 and 104 (PICA 102), April 2008

Date received: October 29, 2007
Final Record of Decision Area E Groundwater and Site 22 (Building 95 Impoundment Area), July 2007
Final Record of Decision Site 180 (PICA 093) Waste Burial Area, September 2007

Date received: October 2, 2007
Final Proposed Plan, Sites 31 and 101 (PICA 072), Former DRMO Yard and Former Gas Station, September 2007

Date received: October 2, 2007
Final Proposed Plan for Area C Groundwater, September 2007

Date received: August 20, 2007
Class 1 Modification Permit Package for Minor Changes Associated with the Area 400 Grinder System for the Hazardous Waste Facility Explosives Waste Incinerator.

Date received: August 1, 2007
Record of Decision for Site 25/26 Soil, Picatinny Arsenal, New Jersey, Final, Revision 1

Date received: February 22, 2007
Final Proposed Plan, Site 180 (PICA 093), Waste Burial Area, U.S. Army Garrison
Picatinny Arsenal, N.J., February 2007
Prepared by ARCADIS U.S., Inc., for U.S. Army

Date received: October 23, 2006
Third Five-Year Review Report: Picatinny Arsenal, Morris County , New Jersey
Prepared by: Shaw Environmental Inc., for Picatinny Arsenal, June 8, 2006

Date received: September 28, 2005
Proposed Plan for Area B Groundwater, Final, Revision 1, September 2005
Environmental Happenings at Picatinny Arsenal, vol. 2, issue 2, July 2005

Date received: September 20, 2005
Record of Decision, Site 34-The Burning Ground-Final, January 2005

Date received: August 11, 2005
Record of Decision-Green Pond Brook/Bear Swamp Brook, Picatinny, New Jersey

Date received: July 11, 2005
Restoration Advisory Board Meeting Minutes for March 10, 2005
Picatinny Arsenel Administrative Record Index as of June 14, 2005

Date received: March 10, 2005
Picatinny Arsenal Administrative Index current as of March 9, 2005

Date received: January 7, 2005
Record of Decision, Site 23--The Post Farm Landfill, Picatinny, New Jersey--August 2004*
*(Due to Picatinny security requirements all maps have been removed from this document. To see the maps this document must be viewed at the Picatinny library. Call 973-724-6748 to make arrangments before visiting the library.)

Date received: December 16, 2004
Picatinny Arsenal Administrative Record Index current as of December 2004*
*(The documents listed in this index are not physically located in the Morris County Library due to the large volume of titles. They can be retrieved for public review upon request.)

Date received: December 9, 2004
Proposed Plan for Site 25/26 Soil: Fact Sheet
Proposed Plan for Site 22 Soil, Sediment and Surface Water and Area E Groundwater: Fact sheet

Date received: December 3, 2004
Proposed Plan for Site 22 Picatinny New Jersey*
Proposed plan for Site 25/26 Picatinny New Jersey*
Proposed plan for Area E Groundwater Picatinny New Jersey*
*(Due to security protocols some of the figures have been removed from these documents. To review copies of these Proposed Plans with all of the figures please contact the Picatinny Environmental Affairs Office at (973) 724-6748.)

Date received: August 7, 2004
Final Environmental Assessment for the Residential Communities Initiative at Picatinny Arsenal, New Jersey

Date received: June 25, 2004
Updated Administrative Record as of May 10, 2004

Date received: March 31, 2004 (2 copies)
Fact Sheet, Picatinny Arsenal, N.J. Proposed Plan for Site 34 – Burning Ground

Date received: March 22, 2004
Community Involvement Response Plan for Picatinny Arsenal –April 1998
Installation Action Plan for Picatinny Arsenal- FY 05 as of December 2003

Date received: February 5, 2004
Picatinny Arsenal, Site 34, The Burning Ground, Proposed Plan (Final, Revision 1)

2003

Picatinny Arsenal Environmental Restoration Advisory Board Meeting 12/18/03
Proposed Plan for Green Pond and Bear Swamp Brooks, Picatinny Arsenal, NJ
Proposed Plan for Site 23, Post Farm Landfill, Picatinny Arsenal, NJ
Lead Engineering Evaluation/Cost Analysis (EE/CA) for Soil Removal at Sites 139, 142, 209 (Building 430), 209 (former Building 303), 161, and 171 Picatinny Arsenal, N.J.
Picatinny Arsenal Environmental Restoration Advisory Board
Meeting minutes for May 2002 -2004
Proposed Plan for Area D Groundwater Picatinny Arsenal NJ-Final Revision

2002

Engineering Evaluation/Cost Analysis for the Removal and Disposal of the Contaminated Sediment from the retention basins of Bear Swamp Brook: Draft June 2002 2 copies also cataloged NJ 628.1 Eng

2001

Picatinny Arsenal Installation Restoration Program, Institutional Control Proposed Plan for Soils: 19, 28, 44, 49 etc. June 2001
Proposed plan for site 20/24 Picatinny Arsenal, N. J. June 2001
Installation Action Plan for U.S. Army Tank-Automotive and Armaments March 2001
Picatinny Arsenal Task Order 19: Engineering Evaluation/Cost Analysis remedial action to treat tetryl in soil from the northern tetryl pits at site 17 March 2001 Pre-Final

2000

Final hazardous waste facility permit, explosive waste incinerator, U.S. Army Armament Research Development and Engineering Center May 2000

1999

Picatinny Arsenal Task Order 19 Engineering Evaluation/ Cost Analysis Site 122 PCB Soils Sept. 1999 (DSERTS #011) PCB Solids at Building 60/ 60A


http://www.mclib.info/docs.html
Morris County Library, Whippany, NJ
30 July 2008